
Warehouse and industrial painting in Phoenix
We paint tall walls, open ceilings, steel columns and tilt-wall exteriors from lifts, in phases so your floor keeps running.


Warehouse painting from the lift
Most of a warehouse is out of reach from a ladder. Walls, deck and joists get painted from boom and scissor lifts.
Where the lifts go, and when, gets set at the site walk. That plan goes into the written bid, next to the products and coats.
These photos are from our own jobs. One is the view from the lift basket under the roof trusses. The other is a column we painted white, with safety yellow at the base.
Industrial painting, surface by surface
Steel, block and tilt-wall each fail in their own way. The prep is different for each one, so the bid lists them one by one.
New concrete can make paint peel. That's why tilt-wall and block get a masonry primer like Loxon before any color goes on.

- Tilt-wall and block exteriors
- FirstCracks and joints repaired, then Loxon primer or conditioner.
- ThenDuration or Emerald, or ConFlex XL elastomeric where the block is cracked.
- Interior walls and open ceilings
- FirstRacking, product and floors covered in the work zone.
- ThenFinish coats put on from boom and scissor lifts.
- Steel columns and bollards
- FirstCleaned and primed.
- ThenWhite above and safety yellow at the base, or your own colors.
- Metal doors and stairs
- FirstMasked with paper and plastic, then a rust-inhibiting primer.
- ThenFinish coats in your colors.

Phased painting so the warehouse keeps shipping
We walk the building with your facilities lead and split it into zones. Trucks and pickers keep moving in one zone while we paint another.
- Nights and weekends when the floor is busiest by day.
- Lift routes and closed zones agreed before the first day.
- Racking, product and floors covered in the zone we're in.
- One owner as the contact for your facilities team.
Yes. We phase the work by area and can work nights and weekends, so the rest of the building keeps running while we paint.
Yes. We paint high walls, the roof deck and joists from boom and scissor lifts, and we plan where they go at the site walk.
Yes. Send plans and your schedule to admin@shieldcoatpainting.com and we'll send back a written, line-item bid.
Yes. Metal gets cleaned and a rust-inhibiting primer before the finish coats, so the paint holds on.
About 10 years for our Premium system and 15 to 20 for Ultra Premium, depending on sun. Paint life is not the warranty. The warranty is a 4 to 5 year workmanship warranty, plus the manufacturer's product warranty.
Yes. Summer work takes early starts and planning each wall around the shade. Our guide on when to paint an exterior in Phoenix explains why.
Yes. We hold Arizona contractor license ROC #361356, class CR-34, a dual license for commercial and residential painting. We're bonded and insured.

Get a bid for your warehouse
Call us or send the request form, and one of us walks the property with you. Have plans, a scope or photos? Email them to admin@shieldcoatpainting.com for a written bid.
